  Budget Planner by AHS for Self Build  
  Project:  
  Contractor's name:  
  Contractor's phone:  
     
  Beginning date:  
  End date:  
     
  Budget Funding Cost
  Existing property sale  
  Mortgage  
  VAT reclaim  
  Sale of mobile home  
  Current savings  
  Total Budget Funding to complete project £0.00
     
  Plot Purchase Cost
  Plot  
  Stamp duty  
  Solicitor  
  Agent's commission (if retained to locate plot)  
  Total Plot Purchase £0.00
     
  Professional Fees Cost
  Architect  
  Quantity Surveyor  
  Structural Warranty  
  Project Management  
  Total Professional Fees £0.00
     
  Local Authority Fees Cost
  Outline/Detailed Planning Application  
  Building Regulation Application/Inspections  
  Total Local Authority Fees £0.00
     
  General Cost
  Interest on borrowed monies  
  Temporary home rental  
  Mobile home and installation  
  Removal costs and furniture storage  
  Estate agent commission on sale of existing property  
  Total General £0.00
     
  Utilities Cost
  Mains water/drainage connection  
  Mains gas connection  
  Mains electric connection  
  Telephone connection  
  Oil/propane gas tank & installation  
  Total Utilities £0.00
     
  Site Clearance/Demolition/Security Cost
  Clearing access/temporary or permanent)  
  Site storage shed  
  Demolition of existing buildings  
  Site stripping of top soil  
  Temporary service supplies & security fencing  
  Temporary protection or removal of overhead power cables  
  Total Site Clearance/Demolition/Security £0.00
     
  Foundations Cost
  Excavation and foundation concrete  
  Below ground blockwork  
  Hardcore/damp proof membrance & concrete oversite/beam & block flooring system  
  Service ducts/foul & surface water drainage. Mains drainage/septic tank  
  Total Foundations £0.00
     
  Advanced Housing Systems Ltd Frame Package Cost
  See quotation for exact specification  
  Total Frame Package £0.00
     
  Timber Frame Erection Cost
  Structural shell erection by AHS  
  Total Frame Erection £0.00
     
  Plant Cost
  Cement mixer  
  Site toilet  
  Scaffolding to be erected prior to delivery of AHS Ltd building system  
  Skips  
  Total Plant £0.00
     
  External Cladding Cost
  Brickwork/blockwork  
  External render  
  Tile/slate hanging  
  Fireplace & chimney stack  
  Total External Cladding £0.00
     
  Roof Tiling Cost
  Tiling/slating  
  Leadwork for valleys/dormers, roof abutments, chimneys, pipe junctions, etc.  
  Total Roof Tiling £0.00
     
  Windows, External Doors, Glazed Screens, Patio Units, Rooflights, etc. Cost
  See Advanced Housing Systems Ltd quotation for exact specification  
  Total Windows, External Doors, Glazed Screens, Patio Units, Rooflights, etc.
£0.00
     
  Conservatory Cost
  Windows, doors and glazed screens  
  Glazed roofing system (sSee Advanced Housing Systems Ltd quotation for exact specification)  
  Additional works to complete conservatory construction  
  Labour for fixing roofing system  
  Total Conservatory £0.00
     
  External Carpentry Cost
  Rainwater goods  
  Balconies, balustrading and timber decking (if applicable)  
  Fascias, bargeboards, soffits & external timber cladding (if applicable)  
  Total External Carpentry £0.00
     
  Internal Carpentry Cost
  Labour to insulate and tack wallboards to internal partitions  
  Fix architrave and skirtings  
  Fix internal window cill boards  
  Fix first floor insulation  
  Fix first floor decking  
  Fix celing counter batten/plasterboard noggins  
  Fix loft insulation and vapour barrier  
  Fix plasterboard to all ceilings  
  Fix coving to all level ceilings  
  Fix ground floor insulation, vapour barrier and chipboard floating floor  
  Fix staircase and loft hatch  
  Total Internal Carpentry £0.00
     
  Electrical Cost
  First fix  
  Second fix  
  Total Electrical £0.00
     
  Plumbing Cost
  First fix  
  Second fix  
  Heating system  
  Heat recovering system  
  Total Plumbing £0.00
     
  Internal Plastering Cost
  Plastering/dry-line internal walls & ceilings  
  Total Plastering £0.00
     
  Kitchen & Bathroom Suites Cost
  Kitchen/utility units and worktops  
  Kitchen appliances  
  Bathroom suites  
  Total Kitchen £0.00
     
  Tiling Cost
  Kitchen & bathroom ceramic wall tiling  
  Floor tiling  
  Total Tiling £0.00
     
  External Works Cost
  Top soil/lawn/paths/garden walling  
  Garage (if attached)  
  Driveway  
  Total External Works £0.00
     
  Decoration Cost
  Internal decoration  
  External decoration  
  Total Decoration £0.00
     
  Finishing Cost
  Carpets/Curtains  
  Total Finishing £0.00
     
  Contingency Cost
  We recommend allowing 5% minimum of overall build costs  
  Total Contingency £0.00
     
  Budget: £0.00
  Total estimate: £0.00
  Remaining: £0.00